February 2023

Flex Posts Installed

Flex posts were recently installed at Nickel St. and Lotus Way to create curb extensions in response to neighborhood concerns about speeding and safety along W. 6th Ave between 287 and Kohl St.

February 2023 → January 2024

Flex Post Pilot Period

This pilot project will. help evaluate if flex posts can be a possible solution to reduce speeding and/or improve safety for all modes of travel throughout Broomfield. The pilot will run  though end of January 2024.

June 19 → July 31 2023

Flex Post Feedback open

Submit how you feel about these posts to better inform the future of this project. 

If your feedback is not received by the end-of-day July 31, your feedback will not be tallied.


September 28 2023

Feedback results posted.

Results from the submitted feedback, and decisions about  the current flex posts and installation of future flexposts will be posted.

October → December 2023

Flex Posts Removed

Flex posts at Nickel St. and Lotus Way along W. 6th Ave will be removed.