KinderCare Learning Center

Share KinderCare Learning Center on Facebook Share KinderCare Learning Center on Twitter Share KinderCare Learning Center on Linkedin Email KinderCare Learning Center link

ARCHIVED

This project was approved at a Public Hearing with the Land Use Review Commission on Monday 12/11/2023.



 

Conceptual rendering of the new Kindercare Learning Center building, viewed from the parking lot

Location

The proposed development is located at 1101 Spring Place (formerly 16849 County Road 7).

Project Description

This proposal is for a new, 11,965 square foot Childcare Learning Center. This will require the approval of a Site Development Plan and Urban Renewal Site Plan for the proposed facility and its site.

The proposal includes over 32,000 square feet of open area and a 12,847 square foot, fenced-in playground. The playground is placed away from the parking lot to enhance safety while providing a visual connection to the adjacent open area.

Site Access and Parking

The primary access to the new building will be from a private drive connecting to County Road 7. The draft site plan shows 31 exterior parking spaces, including 2 Installed Electric Vehicle (EV) Parking Spaces, 2 EV Ready spaces, 7 EV capable spaces, and 2 ADA spaces.

The site plan includes an accessible path to the building, with access from the sidewalks along both County Road 7 and Spring Place (the private drive to the south). The parking area is separated from the street by a landscaped lawn.

To view the conceptual documents please see the document library to the right.

Applicant

Cadence Development LLC

Conformance with the Zoning and Compatibility with Surrounding Uses

This parcel is zoned PUD and is located in the Highlands PUD Plan Area. This parcel is within the Regional Commercial area of the Highlands PUD Plan, which allows Childcare as a permitted land use. At this time the applicant has not identified any necessary variances or PUD amendments as part of their conceptual plan.

The proposed architecture is consistent with the existing commercial uses along the Colorado 7 corridor.

Please see the document titled "SDP Set for LURC" under "Documents" to see full-size site plans.

Construction Contact Information

If you would like to reach out for updates about construction, please contact:

Lucy Dinneen

ldinneen@cadencecap.com

720-496-2586

Location

The proposed development is located at 1101 Spring Place (formerly 16849 County Road 7).

Project Description

This proposal is for a new, 11,965 square foot Childcare Learning Center. This will require the approval of a Site Development Plan and Urban Renewal Site Plan for the proposed facility and its site.

The proposal includes over 32,000 square feet of open area and a 12,847 square foot, fenced-in playground. The playground is placed away from the parking lot to enhance safety while providing a visual connection to the adjacent open area.

Site Access and Parking

The primary access to the new building will be from a private drive connecting to County Road 7. The draft site plan shows 31 exterior parking spaces, including 2 Installed Electric Vehicle (EV) Parking Spaces, 2 EV Ready spaces, 7 EV capable spaces, and 2 ADA spaces.

The site plan includes an accessible path to the building, with access from the sidewalks along both County Road 7 and Spring Place (the private drive to the south). The parking area is separated from the street by a landscaped lawn.

To view the conceptual documents please see the document library to the right.

Applicant

Cadence Development LLC

Conformance with the Zoning and Compatibility with Surrounding Uses

This parcel is zoned PUD and is located in the Highlands PUD Plan Area. This parcel is within the Regional Commercial area of the Highlands PUD Plan, which allows Childcare as a permitted land use. At this time the applicant has not identified any necessary variances or PUD amendments as part of their conceptual plan.

The proposed architecture is consistent with the existing commercial uses along the Colorado 7 corridor.

Please see the document titled "SDP Set for LURC" under "Documents" to see full-size site plans.

Construction Contact Information

If you would like to reach out for updates about construction, please contact:

Lucy Dinneen

ldinneen@cadencecap.com

720-496-2586

Discussions: All (1) Open (0)
  • Public Comment

    12 months ago
    Share Public Comment on Facebook Share Public Comment on Twitter Share Public Comment on Linkedin Email Public Comment link
    CLOSED: This discussion has concluded.

    You need to be signed in to add your comment.

    Thank you for your interest in this development application that has been submitted to the City and County of Broomfield. 

    You can submit public comment for this project by clicking the link below. 

    If you would prefer to provide your written comments directly to the case planner, please send an email to the individual identified under "who's listening".