Midway Boulevard Design
The Midway Boulevard Design project seeks to improve safety, comfort and mobility for people walking, biking, rolling and driving along Midway Boulevard. This project builds upon the vision developed for Midway Boulevard in 2022 after extensive community input. Share your feedback about Midway Boulevard by taking the survey and by dropping pins on the design feedback map and the multiuse path map. Ask your questions under the Q&A tab below.
Project Overview
Midway Boulevard is a high-priority corridor for improving walking and bicycling safety, crossings and speed management. The Midway Boulevard Design project builds on the 2022 Midway Boulevard Multimodal Plan. The City and County of Broomfield (CCOB) developed the 2022 plan with extensive technical analysis and about 1,800 public comments. Federal funding is now available for design and right-of-way acquisition.
The project team will consider engineering and safety requirements, cost, maintenance, field conditions and community feedback when making design decisions. CCOB will coordinate with the Colorado Department of Transportation and other technical partners.
Phase Overview
The improvements to Midway Boulevard move through four phases:
- Study: In 2019, the Broomfield Bicycle and Pedestrian Assessment identified Midway Boulevard as a priority for walking and bicycling investment.
- Concept: From 2021-2022, CCOB studied conditions, evaluated alternatives and worked with the community to develop a vision for the corridor that improves safety and comfort. This is referred to as "the concept."
- Design (current phase): CCOB is refining the 2022 concept to determine what can be kept, adjusted or changed. This includes technical analysis of things like utilities, drainage, cost and more. The design will support construction plans and funding decisions.
- Construction (future): After design is complete and funding is secured, improvements may be built in phases. CCOB has not established a construction schedule.
What the Community Said
Community input helped shape the 2022 Midway Boulevard Multimodal Plan. From July 2021 through October 2022 CCOB collected feedback through in-person events, Broomfield Voice, online maps and surveys, virtual meetings and more. In total, about 1,800 comments were received. Consistent themes included:
- Safety and comfort for people walking and bicycling
- Intersection and crossing safety
- Speeding and speed management
- Traffic operations, access and turning movements
About 90% of respondents said Midway Boulevard needed minor to significant changes. The current design phase builds on that input and focuses on decisions and areas that still need to be refined. Review the previous planning process and community input on the archived Midway Multimodal Plan page.
Public Engagement
The Midway Boulevard Design survey closed on October 19, 2026. Thank you to everyone who shared feedback online and in person during the fall engagement period.
What happens next?
The project team will compile and review feedback from the survey, interactive maps and in-person conversations. Community input will help refine specific areas along the corridor, including multi-use path locations and crossing improvements.
The team will consider this feedback alongside technical, safety, funding and regulatory requirements before finalizing the refined concept. The team will share a summary of what they heard and explain how community input influenced the design.
Stay involved
Additional opportunities to share your input are planned as we head into 2027. Please check back for updates on upcoming community engagement activities and ways to participate.
You can continue to submit questions to the project team under the Q&A tab below.